Partiale FAILURE: Failed to leave Earth orbit (Blok L inverter failure, TLI failure)
Spacecraft data:
Prime contractor
Customer
Platform
Mass at launch
2500 kg
Dry Mass
kg
Basic shape
Dimension
Solar array
Stabilization
Decay:
Descent date:
05 Jan 1963
Lifetime:
1,00 day
Mission:
The escape stage's BOZ unit failed to operate due to failure of a DC transformer of the power system. The stage with payload remained in Earth orbit.
Ref.: #1, #7, #8 - update: 2.03.05